Permit Fees

FEES SUBJECT TO CHANGE WITHOUT NOTICE.
All fees doubled for special hearing.

Building Permit Fees

(Based on Completed Cost of Construction)
Effective as of January 14, 2014

Construction Costs Fee
$0-$25,000 $87.50
$25,001-$50,000 $87.50 for the first $25,000 plus $3.50 for each additional $1,000, or fraction thereof, to and including $50,000
$50,001-$100,000 $175.00 for the first $50,000 plus $3.50 for each additional $1,000, or fraction thereof, to and including $100,000
$100,001 -$500,000 $350.00 for the first $100,000 plus $3.50 for each additional $1,000, or fraction thereof, to and including $500,000
$500,001-$1,000,000 $1,750.00 for the first $500,000 plus $3.50 for each additional $1,000, or fraction thereof, to and including $1,000,000
$1,000,001-$+ $3,500.00 for the first $1,000,000 plus $3.50 for each additional $1,000, or fraction thereof
 
Factory Built Home, Manufactured Homes and Mobile Home: Fee
Permanent Foundation $125.00 per section $250.00 minimum
Any mobile home not requiring a conditional use $150.00
Miscellaneous Building Permits: Fee
Remodel Based on actual labor and material valuation
Reroofing $50.00
Mechanical $50.00
Demolition $50.00
House Moving $50.00

 

Other Inspections and Fees: Fee
1.  Inspection outside of normal business hours $50.00 per hour*
2.  Reinspection fees assessed under provisions of Section 108.4  $30.00 per hour*
3.  Inspection for which no fee is specifically indicated $30.00 per hour*
4.  For use of outside consultants for plan checking and inspections, or both Actual Cost**
5.  For issuance of each temporary Certificate or Occupancy $250.00***
   * Or the total hourly cost to the jurisdiction, whichever is the greatest.  The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
 ** Actual Costs include administrative and overhead costs.
*** $100.00 shall be refunded if a Certificate of Occupancy is issued prior to the expiration of the Temporary Certificate of Occupancy.

 

Minor Subdivision Fees

Acreage Fee
Up to 10.9 acres $550.00
11-20.9 acres $575.00
21-30.9 acres $600.00
31-40.9 acres $625.00
41+ acres *$650.00
*Plus $15.00 per 40 acres or fraction thereof in excess of 60 acres.
 

Planned Development Fees

Acreage FEE
Up to 10.9 acres $725.00
11-20.9 acres $800.00
21-30.9 acres $875.00
31-40.9 acres $950.00
41+ acres *$1,025.00
*Plus $20.00 per 40 acres or fraction thereof in excess of 60 acres.

Application Fees

Application Administrative Full Review
Appeal   $350.00
Certificate of Designation   $500.00
Conditional Use $150.00 $500.00
Conditional Mobile Home Placement $250.00 $500.00
Exemption from Subdivision $300.00 $500.00
Amended Exemption $100.00 $150.00
Minor Subdivision $300.00 (See schedule above.)
Floodplain Development   $75.00
Mobile Home Placement $150.00  
Pre-Application Conference   n/c
Rezoning   $750.00
Sign Placement $75.00  
Special Use   $500.00
Amendment to Special Use $200.00 $500.00
Variance $150.00 BCC - $250.00
BOA - $500.00
Vested Rights   $200.00
1041 Regulations   $800.00 minimum plus additional deposits as required by staff
 

Recording Fees

(In addition to application fees)
Exemptions $11.00 1st page Mylar $10.00 additional pages of Mylar
Minor Subdivision $11.00 1st page Mylar $10.00 additional pages of Mylar
Planned Development $11.00 1st page Mylar $10.00 additional pages of Mylar
Covenants $ 11.00 1st page $5.00 additional pages

 

Zoning Permit

Cost Fee
Non-residential / Non-commercial Construction Fee $50.00