Active Projects

 

Draining level in sewage treatment lagoons

The recent construction to connect our wastewater effluent to the Donala Waste Treatment Facility has been substantially completed.  Remaining, however, is the draining of the lagoons so evaporation can dry out the remaining sludge in the two lagoons previously used to treat waste.  It is anticipated that the removal of the remaining solids in the lagoons will be accomplished by the end of August, 2019

Periodic flushing of the water delivery system

Following a schedule, the Manager periodically opens fire hydrants to allow sediment to be flushed from the system.

Periodic flushing and video taping of sections of the sewer system

Based on video review, repairs to the sewer system are completed as necessary.