State Buildings Programs
State Buildings Forms Contract
Documents See bottom of the table for full comment description.
*Comments:
2. (Notice to Proceed Design/Bid/Build SBP-6.26),
3. (Notice to Proceed to Commence Construction Phase CM/GC SBP -7.26), Name has been changed from "authorization to commence construction phase". 4. (Notice of Approval of Occupancy/Use SBP -01), Name has been changed from "notice of approval of beneficial occupancy". The new #1 item/requirement to be completed before occupancy is approved is that the "notice of substantial completion" is to be issued first including "the building inspection record". Items related to project close-out procedures and not code/life safety concern have been deleted. Notice must be signed by the director of state buildings programs or an authorized delegate before issuance and occupancy/use. 5. (Pre-Acceptance Checklist SBP -05), Name has been changed from "close-out checklist". Items related to code/life safety concerns and not project close-out procedures have been deleted. 6. (Pre-Acceptance Punch List SBP -06), Name has been changed from "contract close-out final punch list"’. 7. (Building Inspection Authorization SBP -018), Exhibit reference has been changed from "f" to "e". Description of requested "building inspections" has been changed to align with the revised Building Inspection Record SBP – BIR. 8. (Inspection Report SBP - 019), Exhibit reference has been changed from "G" To ""F". "building" and "special" inspection description have been changed to align with the revised Building Inspection Record SBP – BIR. 9. (Building Inspection Record SBP- BIR), The format at the top of the form has been revised and "BIR completion date" has been added. "building" and "special" inspection description have been changed to align with 2006 IBC requirements. 10. (Architect/Engineer Agreement Standard Format SC-5.1), First Paragraph Page 1 PARTIES, made date is no longer required. Second Paragraph Page 1 EFFECTIVE DATE AND NOTICE OF NON-LIABILITY, added language indicating that the contract is not effective or enforceable until signed by State Controller or designee. All references to "State Buildings and Real Estate Programs "have been changed to "State Buildings Programs". ARTICLE 3 BASIC SERVICES OF ARCHITECT/ENGINEER Paragraph E.6 the requirement for the code compliance letter has been moved from a. Bidding Documents to b. Contract Documents. ARTICLE 3 BASIC SERVICES OF ARCHITECT/ENGINEER Paragraph F.21, add "(d) Date for Completion of the Punch List Items". ARTICLE 3 BASIC SERVICES OF ARCHITECT/ENGINEER Paragraph F.22, the words "including the Approval of Beneficial Occupancy" have been deleted.
ARTICLE 3 BASIC SERVICES OF ARCHITECT/ENGINEER
Paragraph F.25 - F.29 have been renumbered.
The new language for F.25 explains the Right of
Occupancy of the Principal Representative and
References completing and executing State Form
SBP-.1, Notice of Approval of Occupancy/Use.
ARTICLE 11 MISCELLANEOUS PROVISIONS, Paragraph I,
Indemnification has been added and moved out of
ARTICLE 10 Special Provisions.
ARTICLE 10 SPECIAL PROVISIONS, updated Special
Provision per Office of the State Controller
requirement 1-1-09.
Updated signature page, no longer need to have corporations attest signature and a seal is no longer required. 11. (Construction Project Application SC-4.1 ), "budget/actual costs" line item descriptions have been revised to align with those of the Capital Construction request document CC-C form. "source of funds" has been revised to include bill number (s) and date (s) of funding per phase. "construction delivery method" has been deleted. Added check boxes for Increase/Decreased Funding Increased size of check boxes for source of funds and allowed for more then one to be selected. Aligned form numbering to CC-C: Capital Construction Request. 12. (Base Agreement Terms and Conditions for As-Needed A/E/C Professional Services SC-5.1A ), Updated special provisions per Office of the State Controller requirement including UI-1 form and revised signature page. 13. (Work Authorization SC-5.1A-WA ), First Paragraph Page 1 PARTIES, made date is no longer required. Second Paragraph Page 1 EFFECTIVE DATE AND NOTICE OF NON-LIABILITY, added language indicating that the contract is not effective or enforceable until signed by State Controller or designee. Updated signature page, no longer need to have corporations attest signature and a seal is no longer required. 14. (Contract Amendment SC-6.0 ), First Paragraph Page 1 PARTIES, made date is no longer required. Updated signature page, no longer need to have corporations attest signature and a seal is no longer required. 15. (Contractor’s Agreement SC-6.21 ), First Paragraph Page 1 PARTIES, made date is no longer required. Second Paragraph Page 1 EFFECTIVE DATE AND NOTICE OF NON-LIABILITY, added language indicating that the contract is not effective or enforceable until signed by State Controller or designee. Updated signature page, no longer need to have corporations attest signature and seal is no longer required. 16. (General Conditions of the Contract SC-6.23 ), First Paragraph Page 1 PARTIES, made date is no longer required. Second Paragraph Page 1 EFFECTIVE DATE AND NOTICE OF NON-LIABILITY, added language indicating that the contract is not effective or enforceable until signed by State Controller or designee. ARTICLE 53 MISCELLANEOUS PROVISIONS, Paragraph I, Indemnification has been added and moved out of ARTICLE 52 Special Provisions. ARTICLE 52 SPECIAL PROVISIONS, updated Special Provision per Office of the State Controller requirement 1-1-09. 17. (Consultant Agreement SC-5.3 ), First Paragraph Page 1 PARTIES, made date is no longer required. Second Paragraph Page 1 EFFECTIVE DATE AND NOTICE OF NON-LIABILITY, added language indicating that the contract is not effective or enforceable until signed by State Controller or designee. ARTICLE 14 INDEMNIFICATION, has been added. Indemnification is no longer in ARTICLE 15 SPECIAL PROVISIONS. ARTICLE 15 SPECIAL PROVISIONS, updated Special Provision per Office of the State Controller requirement 1-1-09. Updated signature page, no longer need to have corporations attest signature and seal is no longer required. 18. (Certification and Affidavit Regarding Unauthorized Immigrants UI-1 ), Updated form per revision requirement from Office of the State Controller 19. (Minority/Women Business Participation Report MWBE-1 ),
20. (Architect/Engineer Agreement, Construction Manage/General Contractor Standard Format SC-5.2)
21. (Construction Manager/General Contractor Agreement CM/GC Standard Format SC-6.4) Numerous minor revision and reference corrections have been included in this update allowing for consistency with the General Conditions of the Construction Contract Design/Bid/Build Standard Format SC the following notes summarize the significant changes.
22. (Request for Proposals for an Integrated Project Delivery Method CM/GC IPD CMGC RFP)
23. (Change Order SC-6.31)
24. (Emergency Field Change Order SC-6.31e)
|