Development Review
The Engineering Division is a critical player in the review of all commercial and residential construction within the Town of Estes Park.
The following list contains some of the important aspects that are reviewed during these processes.
All new developments must provide a new ductile iron water line system and an asphalt roadway system as a minimum.
Drainage Planning & Review
All storm water ways are reviewed for compliance with applicable laws. All new subdivisions must meet Standards and go through Planning Department and Engineering Department review processes. All drainage systems, culverts and detention basins must be designed with good engineering practices.
Questions? Contact us at 970-577-3587 or jimber@estes.org.