Energy Fuels Inc. Pinon Ridge Uranium Mill Application
Volume 1
License Application
Cross Reference Checklist Reg. Draft Guide 3024 to Licensee Submittals
Cross Reference Checklist NUREG-1748 to Licensee Submittals
A1 Basic Engineering Report Selected Drawings - General Arrangements
A1 Basic Engineering Report Selected Drawings - Process Flows
A2 Geotechnical Design Recommendations
Appendix A Vicinity Map, Boring Location Plan, Mill Pad Drainage and Grading Plan
Appendix B Logs of Exploratory Borings
Appendix C Laboratory Test Results
Appendix D Augered Pressure Grouted Piles Allowable Capacity
Appendix E Design Ground Motions
A3 Roadway Pavement Design Recommendations
Appendix A Vicinity Map, Locations of Borings and Test Pits for Roadway, Pavement Design
Appendix B Logs of Pavement Borings and Pits
Appendix D Roadway Thickness Calculations and Design Charts
A4 Site Drainage Analysis and Design Report
Appendix A South Diversion Channel and Berm
Appendix B West Stormwater Pond
Appendix C East Stormwater Pond
Appendix D Ore Pad Channel
Appendix E Storm Sewer Network
Appendix F Evaporation Pond Diversion Channels
Appendix G Main Access Road Drainage
Site Grading, Drainage and Access Road Design Drawings C1-C7
Site Grading, Drainage and Access Road Design Drawings C8-C14
Site Grading, Drainage and Access Road Design Drawings C15-C28