*Comments:
1.
(Architect/Engineer Agreement Standard Format SC-5.1),
-
COVER AND
PAGE 1, Changed Contract Routing No. to Contract
ID Number to align with new Contract Management System.
-
ARTICLE
8. INSURANCE, Paragraph 8.1.1.2, the words
"Automobile Liability" have been deleted. It is no
longer a requirement to name the State of Colorado
as an additional insured for automobile liability;
however, automobile liability is still a requirement
of the contract.
-
ARTICLE
11. MISCELLANEOUS PROVISIONS, Paragraph 11.23
STATEWIDE CONTRACT MANAGEMENT SYSTEM
-
EXHIBIT
F, DESIGNATED SCOPE OF SERVICES, has been deleted;
no longer required. Exhibit numbering has been
realigned due to this deletion.
-
EXHIBIT
I, SOLE SOURCE GOVERNMENT CONTRACTS (if applicable),
cover sheet added to contract; attach required
language if applicable.
-
EXHIBIT
J, CONTRACT MANAGEMENT INFORMATION – VENDOR
PERFORMANCE EVALUATION FORM (if applicable, cover
sheet added to contract; attach required language
(Form SB-228.v1) if applicable.
2.
(Architect/Engineer Agreement Construction
Manager/General Contractor Standard Format SC-5.2)
-
COVER AND
PAGE 1, Changed Contract Routing No. to Contract
ID Number to align with new Contract Management System.
-
ARTICLE
8. INSURANCE, Paragraph 8.1.1.2, the words
"Automobile Liability" have been deleted. It is no
longer a requirement to name the State of Colorado
as an additional insured for automobile liability;
however, automobile liability is still a requirement
of the contract.
-
ARTICLE
11. MISCELLANEOUS PROVISIONS, added 11.26 STATEWIDE
CONTRACT MANAGEMENT SYSTEM
-
EXHIBIT
F, DESIGNATED SCOPE OF SERVICES, has been deleted;
no longer required. Exhibit numbering has been
realigned due to this deletion.
-
EXHIBIT
I, SOLE SOURCE GOVERNMENT CONTRACTS (if applicable),
cover sheet added to contract; attach required
language if applicable.
-
EXHIBIT
J, CONTRACT MANAGEMENT INFORMATION – VENDOR
PERFORMANCE EVALUATION FORM (if applicable, cover
sheet added to contract; attach required language
(Form SB-228.v1) if applicable.
3.
(Consultant Agreement Standard Format SC-5.3),
-
COVER AND
PAGE 1, Changed Contract Routing No. to Contract
ID Number to align with new Contract Management System.
-
ARTICLE
13. INSURANCE, Paragraph 13.1.1.2, the words
"Automobile Liability" have been deleted. It is no
longer a requirement to name the State of Colorado
as an additional insured for automobile liability;
however, automobile liability is still a requirement
of the contract.
-
ARTICLE
16. STATEWIDE CONTRACT MANAGEMENT SYSTEM
-
EXHIBIT
F, SOLE SOURCE GOVERNMENT CONTRACTS (if
applicable), cover sheet added to contract; attach
required language if applicable.
-
EXHIBIT
G, CONTRACT MANAGEMENT INFORMATION – VENDOR
PERFORMANCE EVALUATION FORM (if applicable, cover
sheet added to contract; attach required language
(Form SB-228.v1) if applicable.
4.
(Construction Manager/General Contractor Agreement CM/GC
Standard Format SC-6.4),
-
COVER AND
PAGE 1, Changed Contract Routing No. to Contract
ID Number to align with new Contract Management System.
-
ARTICLE
2. DEFINITIONS, added 2.1.6.8 EXHIBIT D.2, SOLE
SOURCE GOVERNMENT CONTRACTS (if applicable,
attached), cover sheet added to contract; attach
required language if applicable.
-
ARTICLE
2. DEFINITIONS, added 2.1.6.9 Exhibit E, CONTRACT
MANAGEMENT INFORMATION CONSTRUCTION CONTRACTOR –
PERFORMANCE EVALUATION REPORT (Form SB-228 C.v1)
-
ARTICLE
21. MISCELLANEOUS PROVISIONS added 21.22 STATEWIDE
CONTRACT MANAGEMENT SYSTEM.
5.
(Contractor’s Agreement Design/Bid/Build Standard Format
SC-6.21),
-
COVER AND
PAGE 1, Changed Contract Routing No. to Contract
ID Number to align with new Contract Management System.
-
COVER
SHEET FOR EXHIBITS (A-H) CREATED, including the
addition of G.
Sole Source
Government Contracts and H.
Contract
Management Information Construction Contractor -
Performance Evaluation Report.
6.
(The General Conditions of the Construction Contract
Design/Bid/Build Standard Format SC-6.23)
-
ARTICLE
25. INSURANCE B. Automobile Liability, under
Coverage’s, deleted #1 Additional insured
endorsement.
-
ARTICLE
53. MISCELLANEOUS PROVISIONS added J STATEWIDE
CONTRACT MANAGEMENT SYSTEM.
7.
(Work Authorization As-Needed
Architect/Engineering/Consultant Professional Services
SC-5.1A-WA)
-
INSTRUCTIONS PAGE, Added language for new limits for
Institutions of Higher Education.
-
INSTRUCTIONS PAGE, Deleted reference to CLIN/CLI2 and
entered instructions for Contract Management System
-
PAGE 1,
Changed Work Authorization Routing No. on to
Contract ID No. to align with new Contract
Management System.
8.
(ARRA – American Recovery and Reinvestment Act of 2009)
9.
(Contract Exhibits)
The following
contract exhibits are listed in the chart above as links
to Office of the State Controller (OSC) website.
10.
(Information for Bidders SBP-6.12)
-
Deleted
1. Contractor Qualification language - as of 11/2/09
contractors are no longer required to be qualified
and registered with SBP
-
Renumbered remaining numbers to align with new list
of information
|
|